日韩人妻视频无码_国产又刺激又黄又免费的视频_久久无码AV一区二区_国产激情久久久久久熟女老人_亚洲日韩精品无码综合

?

News Center

News Center

You are:News Center > News Center

Zhangzhou LNG Project Dome Modules Completed

Time: 2023-10-31 Source: Author:站點(diǎn)管理員

     CNF Completed the Zhangzhou LNG Project Dome Module Lifting Project as Planned.

  

      The project utilized a modular construction approach, including a 160,000 m3 LNG storage tank

   with a dome featuring a spherical design. The dome was divided into 24 modular sections, comprising 

  12 large segments, each measuring 40m in length and weighing approximately 23t, as well as 12 small 

  segments, each measuring 36m in length and weighing around 11t. The entire tank utilized a symmetrical 

  lifting method for the large dome sections to ensure the project"s efficient and safe execution.